Becden Dental Laboratories

Project Details:

Owner: Becden Dental
Location: Draper, UT
Architect: WLDLM Design
Completed: February, 2003
Building Size: 8,600 square feet
Site Size: .28 acres
Procurement Type: Hard Bid

Description:

Alta View Hospital Emergency Department Addition & Remodel required a heightened attention to detail as the existing emergency room and adjacent life flight helicopter pad had to remain fully operational throughout construction. A 3-phased approach was used to first construct an addition to the existing emergency room. This required the existing building be shored with helical piers to allow a new basement level to be excavated. Once this building was fully occupied, ½ of the existing emergency room was renovated as phase 2 and the remaining ½ as phase 3. Strict noise abatement, dust control and infectious disease control measures were enforced throughout construction.