<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Camco Construction &#187; Renovation/Remodel</title>
	<atom:link href="http://camcoconstruction.com/project-portfolio/renovationremodel/feed" rel="self" type="application/rss+xml" />
	<link>http://camcoconstruction.com</link>
	<description></description>
	<lastBuildDate>Mon, 07 Nov 2011 22:18:06 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>Fashion Place Mall Renovation</title>
		<link>http://camcoconstruction.com/fashion-place-mall-renovation-2</link>
		<comments>http://camcoconstruction.com/fashion-place-mall-renovation-2#comments</comments>
		<pubDate>Thu, 21 Jan 2010 21:00:48 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Renovation/Remodel]]></category>

		<guid isPermaLink="false">http://camcoconstruction.com/?p=350</guid>
		<description><![CDATA[Project Details: Owner: General Growth Properties, Inc. Location: Murray, UT Architect: Mulvanny G2 Architecture Completed: November, 2008 Building Size: 165,107 square feet Site Size: 68.05 acres Procurement Type: Hard Bid Description: The project included a complete renovation of all interior floors, ceilings, electrical, mechanical, site utility re-locations, power loop replacement, 61,445 s.f. of new galleria [...]]]></description>
			<content:encoded><![CDATA[<h3>Project Details:</h3>
<p><strong>Owner: </strong> <a href="http://www.ggp.com">General Growth Properties, Inc. </a><br />
<strong>Location:</strong>  Murray, UT<br />
<strong>Architect:</strong>  <a href="http://www.mg2.com">Mulvanny G2 Architecture </a><br />
<strong>Completed: </strong> November, 2008<br />
<strong>Building Size:</strong>  165,107 square feet<br />
<strong>Site Size:</strong>  68.05 acres<br />
<strong>Procurement Type: </strong> Hard Bid<br />
<br class="spacer"/></p>
<h3>Description: </h3>
<p> The project included a complete renovation of all interior floors, ceilings, electrical, mechanical, site utility re-locations, power loop replacement, 61,445 s.f. of new galleria style retail space, foodcourt remodel &#038; new entrance, restroom remodels, new mall management space, Cheesecake Factory pad, Nordstrom pad, and new 17,000 s.f. connector building between the existing mall and new Nordstrom.  All new site utility work was constructed without interrupting the mall water, gas, power, or phone lines.  In order to comply with current code, acute attention to the weight of the new ceiling elements was paid so as not to overload the capacity of the existing structure, lightweight materials were used, saving millions in structural upgrade costs.  All work was performed while keeping all mall tenants open and in full operation as well as while maintaining all mall emergency egress exits.</p>
]]></content:encoded>
			<wfw:commentRss>http://camcoconstruction.com/fashion-place-mall-renovation-2/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ultradent Manufacturing</title>
		<link>http://camcoconstruction.com/ultradent-manufacturing</link>
		<comments>http://camcoconstruction.com/ultradent-manufacturing#comments</comments>
		<pubDate>Thu, 21 Jan 2010 20:58:28 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Renovation/Remodel]]></category>

		<guid isPermaLink="false">http://camcoconstruction.com/?p=348</guid>
		<description><![CDATA[Project Details: Owner: Ultradent Products, Inc. Location: South Jordan, UT Architect: GSBS Architects Completed: Various (most recent April, 2009) Building Size: 175,000 square feet Site Size: 6 acres Procurement Type: Negotiated Description: Camco has performed several additions and renovations for Ultradent. Ultradent manufactures dental products including composites, endodontics, etchants and bonding, tips/syringes, tissue management and [...]]]></description>
			<content:encoded><![CDATA[<h3>Project Details:</h3>
<p><strong>Owner:</strong>  <a href="http://www.ultradent.com">Ultradent Products, Inc.</a><br />
<strong>Location:</strong>  South Jordan, UT<br />
<strong>Architect:</strong>  <a href="http://www.gsbsarchitects.com">GSBS Architects</a><br />
<strong>Completed:</strong>  Various (most recent April, 2009)<br />
<strong>Building Size:</strong>  175,000 square feet<br />
<strong>Site Size:</strong>  6 acres<br />
<strong>Procurement Type: </strong> Negotiated<br />
<br class="spacer"/></p>
<h3>Description:</h3>
<p>Camco has performed several additions and renovations for Ultradent.  Ultradent manufactures dental products including composites, endodontics, etchants and bonding, tips/syringes, tissue management and whitening products among others.  The office includes a two-story lobby with hand painted murals of Utah landscapes, indoor stream, exercise and locker facilities, and kitchen/break areas.  The warehouse area includes laboratory, cleanroom manufacturing spaces, wet process area, filling and packaging area, and shipping/receiving area.  There is also an explosion proof mixing room.  The majority of the building is considered a “clean environment” with extensive high-effect air filtration systems including dust-free pressurized rooms and zones.  Due to the custom manufacturing process, changes were made by the owner on the fly throughout the projects.</p>
]]></content:encoded>
			<wfw:commentRss>http://camcoconstruction.com/ultradent-manufacturing/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Superior Air Handling Company Remodel</title>
		<link>http://camcoconstruction.com/superior-air-handling-company-remodel</link>
		<comments>http://camcoconstruction.com/superior-air-handling-company-remodel#comments</comments>
		<pubDate>Thu, 21 Jan 2010 20:56:11 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Renovation/Remodel]]></category>

		<guid isPermaLink="false">http://camcoconstruction.com/?p=346</guid>
		<description><![CDATA[Project Details: Owner: Superior Air Handling Company Location: Clearfield, UT Architect: Prism Design Completed: October, 2002 Building Size: 220,000 square feet Site Size: 13 acres Procurement Type: Negotiated Description: SAHCO is one of the nation’s leading HVAC sheet metal contractors. Superior purchased an existing building into which they re-located their entire corporate offices and manufacturing [...]]]></description>
			<content:encoded><![CDATA[<h3>Project Details:</h3>
<p><strong>Owner: </strong> <a href="http://www.sahco.com">Superior Air Handling Company</a><br />
<strong>Location: </strong> Clearfield, UT<br />
<strong>Architect: </strong> Prism Design<br />
<strong>Completed: </strong> October, 2002<br />
<strong>Building Size:</strong>  220,000 square feet<br />
<strong>Site Size: </strong> 13 acres<br />
<strong>Procurement Type:</strong>  Negotiated<br />
<br class="spacer"/></p>
<h3>Description:</h3>
<p>SAHCO is one of the nation’s leading HVAC sheet metal contractors.  Superior purchased an existing building into which they re-located their entire corporate offices and manufacturing facilities.  Camco completely renovated the 27,000 square foot two-story office area and added an additional 3,000 square feet of office mezzanine.  The project also included various manufacturing area improvements specific to Superior’s operations including demising walls, concrete pads, concrete pits, a fire rated built-in vault, and various site improvements to add additional parking and update landscaping.  Due to some of Superior’s heavy duty manufacturing processes, the wall separating the office and warehouse was brought up to a two hour fire rating.  A new brick veneer wainscot building façade was also installed to update building aesthetics.</p>
]]></content:encoded>
			<wfw:commentRss>http://camcoconstruction.com/superior-air-handling-company-remodel/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Radisson Hotel Remodel</title>
		<link>http://camcoconstruction.com/radisson-hotel-remodel</link>
		<comments>http://camcoconstruction.com/radisson-hotel-remodel#comments</comments>
		<pubDate>Thu, 21 Jan 2010 20:53:48 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Renovation/Remodel]]></category>

		<guid isPermaLink="false">http://camcoconstruction.com/?p=344</guid>
		<description><![CDATA[Project Details: Owner: Radisson Hotels &#038; Resorts Location: Salt Lake City, UT Architect: Jonathan Nehmer + Associates Completed: January, 2006 Building Size: 199,848 square feet Site Size: N/A Procurement Type: Hard Bid w/ Team Qualifications Description: Radisson Hotels &#038; Resorts selected Camco to renovate their 11 story downtown Salt Lake City location through a value [...]]]></description>
			<content:encoded><![CDATA[<h3>Project Details:</h3>
<p><strong>Owner:</strong>  <a href="http://www.radisson.com">Radisson Hotels &#038; Resorts</a><br />
<strong>Location:</strong>  Salt Lake City, UT<br />
<strong>Architect: </strong> <a href="http://www.nehmer.com">Jonathan Nehmer + Associates</a><br />
<strong>Completed:</strong>  January, 2006<br />
<strong>Building Size:</strong>  199,848 square feet<br />
<strong>Site Size:</strong>  N/A<br />
<strong>Procurement Type:</strong>  Hard Bid w/ Team Qualifications<br />
<br class="spacer"/></p>
<h3>Description:</h3>
<p> Radisson Hotels &#038; Resorts selected Camco to renovate their 11 story downtown Salt Lake City location through a value based hard bid with subsequent interview format.  Although Camco’s bid was not the lowest dollar amount, the Radisson team was impressed with the level of detail presented in the proposal and Camco’s selected team’s qualifications and experience.  The project consisted of two phases and the complete renovation of all 381 guest rooms and bathrooms, as well as all public spaces including ballrooms, conference rooms, and exercise facilities.  All work was completed while the hotel remained in full operation and at capacity, other than those areas where construction was taking place. </p>
]]></content:encoded>
			<wfw:commentRss>http://camcoconstruction.com/radisson-hotel-remodel/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Boise Towne Square TRP Renovation</title>
		<link>http://camcoconstruction.com/boise-towne-square-trp-renovation</link>
		<comments>http://camcoconstruction.com/boise-towne-square-trp-renovation#comments</comments>
		<pubDate>Thu, 21 Jan 2010 20:47:35 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Renovation/Remodel]]></category>

		<guid isPermaLink="false">http://camcoconstruction.com/?p=342</guid>
		<description><![CDATA[Project Details: Owner: General Growth Properties, Inc. Location: Boise, ID Architect: MBH Architects Completed: October, 2008 Building Size: 276,000 square feet Site Size: N/A Procurement Type: Hard Bid Description: This project included underground site utility re-locations in order to accommodate a new Cheesecake Factory, various site improvements updating landscaping and parking layout, new construction of [...]]]></description>
			<content:encoded><![CDATA[<h3>Project Details:</h3>
<p><strong>Owner:</strong>  <a href="http://www.ggp.com">General Growth Properties, Inc.</a><br />
<strong>Location:</strong>  Boise, ID<br />
<strong>Architect:</strong>  <a href="http://www.mbharch.com">MBH Architects</a><br />
<strong>Completed:</strong>  October, 2008<br />
<strong>Building Size:</strong>  276,000 square feet<br />
<strong>Site Size: </strong> N/A<br />
<strong>Procurement Type:</strong>  Hard Bid<br />
<br class="spacer"/></p>
<h3>Description:</h3>
<p>This project included underground site utility re-locations in order to accommodate a new Cheesecake Factory, various site improvements updating landscaping and parking layout, new construction of a main mall entrance including a Borders Books and Talbots.  The new entrance includes a colored and stamped concrete plaza.  The entire mall interior was also renovated including demolition of all existing floor and wall tile, ceilings, lighting and mechanical systems.  The new floor tile system included extensive preparation of the existing slab with leveling compound, so that a lifetime warranty on the new tile could be provided.  All ceilings, lighting, electrical &#038; data were also replaced in the councourses.  All work was completed while the mall remained open and fully operational, without interruption to business.</p>
]]></content:encoded>
			<wfw:commentRss>http://camcoconstruction.com/boise-towne-square-trp-renovation/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

